Selected work
Live plants, energised switchyards, operating dry docks, undocumented structures and fixed handover dates. Each case study below sets out what made the job difficult and what we did about it.
- 0+
- Packages delivered since 2008
- 0kT
- Tonnes recovered and rerouted
- 0%
- Average diversion from landfill
- 0
- Client outages caused in five years
Case studies
Every case study includes the challenge as it actually presented, the engineering response, and outcome figures reconcilable to project records.

Client perspective
“They found a load path in our crane rail structure that none of our drawings showed, two weeks before we would have started demolishing on the assumption it was not there. That single piece of survey work justified the whole engagement.”

Your project
Bring us the one nobody wants to price.
Undocumented structures, live-plant adjacency, contaminated ground and immovable dates. That is the work we are built for.