Fleet & capability

Plant is mobilised against the engineered sequence, never the other way round. Where the correct machine is not in our fleet, we bring in the correct machine rather than bending the method to fit the yard.

Max working height
65 m
Lift capacity accessed
750 t
Crushing throughput
350 t/h
SPMT axle capacity
48 t per line
Primary Demolition

High-Reach Demolition Excavators

Ultra-long-front machines that take structures down from the top without ever putting a person under the load.

High-reach machines are the backbone of controlled structural demolition. Working from a verified standing platform outside the drop zone, they reduce a structure progressively from the crown down — which keeps the collapse mechanism predictable and keeps every operative outside the exclusion radius throughout. Our fleet access extends to 65 metres of working height with interchangeable front assemblies, so a single machine can move between shear, pulveriser and grapple work as the sequence changes.

Maximum working height
65 m
Operating weight class
35 – 130 t
Front assemblies
Shear · pulveriser · grapple · breaker
Cab protection
FOPS/ROPS with tilting cab and screen guards
Controls
Load-moment limiter with reach-envelope alarm

Deployed on

Boiler house and turbine hall demolitionSteel frame and gantry takedownSilo and bunker reductionWarehouse and portal frame clearance
01 / 08
Lifting & Rigging

Heavy Crawler Cranes

Lattice-boom capacity for critical lifts where components must come out intact.

Where a component has to leave site whole — a 210-tonne distillation column, a stator, a press bed — crawler craneage is the method. We mobilise lattice-boom machines through long-standing project partners, selected against the specific radius, configuration and ground bearing the engineered lift plan demands rather than against yard availability. Every lift is executed against a drawn plan with certified, inspected gear and appointed-person supervision.

Capacity accessed
Up to 750 t
Configurations
Main boom · luffing jib · superlift
Ground verification
Bearing pressure calculation and mat design
Lift documentation
Categorised plan with calculation pack
Supervision
Appointed person and slinger-signaller cover

Deployed on

Column and vessel removalTransformer and generator liftingGantry and crane dismantlingHeavy component relocation
02 / 08
Processing Attachments

Hydraulic Shears & Pulverisers

Cold mechanical separation that eliminates ignition risk and preserves material grade.

Mechanical attachments are our default cutting method, and the reason is as much commercial as it is safety-driven. Cold shearing produces no fume, requires no hot-work permit and generates no ignition source in hydrocarbon environments — while leaving steel clean and gradeable rather than heat-affected and contaminated. On one refinery programme, defaulting to cold cutting removed roughly seventy per cent of the hot-work permits the original method would have required.

Shear jaw opening
Up to 1,100 mm
Cutting force
Up to 1,400 t at the tip
Rotation
360° hydraulic on all primary units
Pulveriser output
Concrete reduced with rebar liberated for recovery
Permit impact
No hot-work permit required

Deployed on

Structural steel reductionReinforced concrete processingRebar liberation and recoveryHydrocarbon-area cutting
03 / 08
Recovery & Logistics

Material Handlers

Purpose-built handlers that keep segregated streams segregated all the way to dispatch.

Recovery value survives only if separation survives. Material handlers with elevating cabs and orange-peel or sorting grabs move graded streams from the work front into segregated bays without the cross-contamination that a general-purpose excavator inevitably causes. Elevated cabs give the operator direct sight of grade separation as it happens, which is why our diversion and grade-accuracy figures hold up under audit.

Reach
Up to 22 m
Cab elevation
Hydraulic riser to 5.5 m eye height
Attachments
Orange-peel · sorting grab · magnet · shear
Stability
Four-point outrigger with load-moment monitoring
Application
Grade-segregated loading and dispatch

Deployed on

Scrap grading and consolidationSegregated stream loadingYard and laydown managementWeighbridge dispatch handling
04 / 08
On-Site Processing

Mobile Crushing & Screening

Concrete arisings converted into certified graded aggregate without leaving the site.

Hauling demolition concrete out and importing fill back in is expensive, slow and environmentally poor. Where the redevelopment programme can accept it, we crush and screen on site to a tested, certified aggregate specification suitable for piling mats, haul roads and structural backfill. On a recent logistics clearance this retained 4,100 tonnes on site and removed around 190 haulage movements from local roads.

Jaw crusher throughput
Up to 350 t/h
Output grades
Multiple graded fractions to specification
Rebar separation
Overband magnet with recovery conveyor
Dust control
Integrated suppression at every transfer point
Certification
On-site testing to aggregate specification

Deployed on

Slab and hardstanding processingPiling mat aggregate productionStructural backfill generationHaulage movement reduction
Mobile Crushing & Screening
05 / 08
Precision Separation

Cold Cutting & Diamond Wire Systems

Spark-free severance of heavy sections in live and hazardous atmospheres.

Diamond wire and cold cutting systems sever sections that mechanical shears cannot reach and thermal cutting is not permitted to touch — thick-wall vessels inside a live hydrocarbon boundary, reinforced concrete with heavy congestion, submerged or partially charged structures. The cut is clean, dimensionally controlled and completely free of ignition source, which is often the only reason a scope can proceed without an outage.

Diamond wire capacity
Sections beyond 3 m diameter
Ignition risk
None — no hot-work permit required
Cut quality
Dimensionally controlled, reusable faces
Deployment
Remote operation from outside the cut zone
Environments
Live plant · ATEX zones · submerged

Deployed on

Thick-wall vessel severanceReinforced concrete cuttingLive-plant adjacent workExplosive-atmosphere environments
06 / 08
Environmental Control

Atomised Dust Suppression

Fine-mist cannons that capture airborne particulate before it reaches a boundary.

Atomised suppression works by matching droplet size to particulate size so that dust is captured in the air rather than merely wetted after it settles. Cannons are positioned against prevailing wind and the active work front, with boundary monitoring confirming performance against agreed thresholds. Across a 120-metre chimney demolition beside a live switchyard, this regime recorded no boundary exceedance in eight months.

Throw distance
Up to 80 m
Droplet size
50 – 200 micron atomisation
Coverage
Up to 5,600 m² per unit oscillating
Water efficiency
Substantially below conventional spraying
Monitoring
Continuous boundary particulate measurement

Deployed on

Structural demolition frontsCrushing and screening operationsStockpile and haul road controlBoundary-sensitive sites
Atomised Dust Suppression
07 / 08
Movement & Logistics

Heavy Transport & SPMT

Self-propelled modular transport for loads that no crane configuration can reach.

When a load is too heavy, too large or too awkwardly positioned for craneage, it gets moved rather than lifted. SPMT modules, hydraulic skidding systems and climbing jacks extend what is achievable where radius, headroom or ground conditions rule conventional lifting out. On an automotive relocation, a 320-tonne indivisible press bed was skidded across a load-spread raft to a hardstand from which it could finally be lifted.

SPMT axle capacity
Up to 48 t per axle line
Skidding capacity
Up to 600 t per system
Jacking
Synchronised climbing and strand jacks
Route engineering
Survey, permits and escort coordination
Ground verification
Load spread designed to actual slab construction

Deployed on

Oversize component movementConfined-access extractionBridge and structure transportIntra-site heavy relocation
08 / 08
Fleet standards

Machines are only as safe as their maintenance state, their operator and the plan they are working to. All three are verified before deployment.

Pre-deployment inspection

Every unit inspected against a documented checklist before mobilisation, with defects closed rather than noted.

Operator competence verified

Machine-specific competence assessed and currency tracked. High-reach hours are evidenced, not claimed.

Load-moment monitoring

Demolition machines are fitted with reach-envelope and load-moment limiting appropriate to the configuration in use.

Attachment certification

Shears, pulverisers, grabs and breakers carry current certification and are matched to carrier capacity by calculation.

Ground bearing verified

Standing platforms designed against measured ground or slab construction — confirmed by trial pit or core where records are absent.

Rigging gear logged

Every item of lifting gear is certified, inspected and logged before it goes to the hook, with a discard regime by condition.

Environmental fit

Emissions, noise output and dust generation are inputs to plant selection, particularly on boundary-sensitive sites.

Maintenance in-programme

Servicing is scheduled into the programme rather than deferred, because a machine down mid-sequence is a safety issue before it is a delay.

Mobilisation

Need a specific capability on site?

Tell us the constraint — reach, capacity, access, atmosphere — and we will confirm what can be mobilised and how quickly.